The Project Overview

When BAM Nuttall required a reliable, heavy-duty access solution for a complex infrastructure project in Llanbarn Fawr, Wales, they turned to the experts at Notus Ground Safe. The project demanded a high-performance trackway hire system capable of supporting heavy plant machinery while navigating the logistical hurdles of a remote, rural location.

Operating in the scenic but challenging Welsh landscape meant dealing with unpredictable ground conditions and restricted access routes. Our mission was clear: provide a stable temporary roadway that would allow the project to proceed on schedule, regardless of the weather or terrain.

The Challenge: Restricted Access & Sensitive Terrain

Infrastructure projects in rural areas like Llanbarn Fawr often face "last-mile" delivery issues. The site featured narrow access points and soft, sensitive ground that could easily be damaged by heavy vehicle movements.

Following a detailed site survey—a standard part of our ground protection solutions—it was determined that a carefully managed installation strategy was essential. We needed to ensure that the delivery of our trackway panels didn't cause the very congestion or ground damage we were there to prevent.

The Solution: High-Performance Trackway Hire

To meet the client’s rigorous standards, Notus Ground Safe deployed a total of 355 heavy-duty trackway panels. This project also served as the inaugural deployment for our brand-new fleet of panels, which are engineered to the highest ISO standards and capable of supporting loads up to 200 tonnes.

Efficiency was key. Using a Manitou telehandler equipped with a specialist clamp attachment, our team executed a precision installation. By using mechanical laying techniques, we were able to:

  • Install 355 panels in just three days, significantly reducing site downtime.
  • Maintain a safe working environment by minimizing manual handling.
  • Operate effectively within tight site constraints, ensuring the temporary access road followed the exact contours required by the client.

The Results: 6 Months of Reliable Ground Protection

The completed trackway system provides a solid, dependable platform for all site traffic, from light commercial vehicles to heavy plant machinery. By choosing our trackway hire UKservice, BAM Nuttall secured a six-month access solution that:

  1. Ensures Safe Plant Movement: Even in wet or soft ground conditions, the ribbed surface of our mats provides maximum traction.
  2. Protects the Environment: The underlying Welsh soil remains undisturbed, simplifying the reinstatement process once the project is complete.
  3. Prevents Project Delays: With a stable temporary roadway system in place, work can continue through the winter months without vehicles getting bogged down.

Management Insight

James, Managing Director at Notus Ground Safe, commented:
"This project in Llanbarn Fawr is a prime example of how detailed planning and the right equipment make a tangible difference on challenging sites. From coordinating the delivery of our new fleet to completing a rapid installation within a tight timeframe, our team delivered a solution that keeps the client’s programme moving while maintaining the highest safety standards. We take pride in being a reliable partner for Tier 1 contractors like BAM Nuttall."

Why Choose Notus Ground Safe for Trackway Hire?

Whether you are managing a utility installation, a renewable energy project, or a large-scale construction site, Notus Ground Safe provides the pure SEO power—and physical power—needed to keep your site accessible. With over 20 years of experience and a commitment to fast 24-hour turnarounds, we are the UK’s go-to for temporary roadway hire and construction site access mats.